Introduction

Providence Research Ltd has the right blend of technical automation knowledge, diverse resources and project execution consistency to enable you leverage your relationship with us do deliver on the important results.

Below is a listing of our project archive: -

Oil & Gas

  • Tie-in Five Tanks into Tank Gauging System for Port-Harcourt Refinery 1994
  • Technical Back-Up/Maintenance Service to Warri Refinery and Petroleum Company (WRPC) in Partnership with Stripes      Electronics Instrumentation Ltd. 1995/97
  • Ladder Logic Design and Modification for Siemens and Allen-Bradley PLC for PETRACH (Oil & Gas Service Company) 1998.
  • Monitoring of Bonny Export Terminal (BET) facility through SCADA from Oil Movement in Port-Harcourt Refinery Company      (PHRC) 2000
  • Programmable Logic Controller Training Workshops for Warri Refinery and Petroleum Company, Port-Harcourt Refinery      Company and Eleme Petrochemical Company Ltd. Staffers in partnership with Stripes Electronics and Instrumentation Ltd.      1997.
  • Separate Shutdown on Reforming Heaters for WRPC 1999/2000
  • Commissioning of BET – Responsible for PLC & Intellusion SCADA – PHRC. 2000
  • WRPC Incinerator Control Systems Rehabilitation. 2003/2004
  • WRPC Turn Around Maintenance(TAM) & REHABILITATION. 2002-2004
    • Replacement of Fuji Synchronization PLC
    • Hook Up To DCS for Hydraulic Skid
    • Hook Up To DCS for Nuovo Pignone Compressor Control Panel
    • Engineering, Installation and Commissioning for Nuovo Pignone Control Panels, Plug and Slide Vales Hydraulic Skid
    • Maintenance Support for Nuovo Pignone Compressor Control Panels
  • Technical Backup and Maintenance Support for PLC/DCS in Warri Refining and Petrochemical Company Ltd. 2004-till date
  • Technical Backup and Maintenance Support for PLC/DCS in Indorama /Eleme Petrochemical Company Ltd. 2006-2008
  • Development and Installation of Air Drier Package on Siemens PLC for Kaduna Refining and Petrochemical Company Ltd.      2007
  • Installation of SOCOMEC UPS for Power Plant & Utilities (PPU) in WRPC. 2007
  • Engineering, Procurement, Construction of Control system for Steam Turbine Driven Wet Gas Compressor for Kaduna      Refining and Petrochemical Company Ltd (KRPC). 2008
  • Installation of Tape for Local Tank gauging system at Indorama/Eleme Petrochemical Ltd. 2008
  • Replacement of Yokogawa Colour hardcopy with HP printer based colour hardcopy for Process control room and PPU in      Port-Harcourt Refining and Petrochemical Co. Ltd. 2008
  • Extension of Internet facilities to the Plant Area in Warri Refining and Petrochemical Co. Ltd. 2008
  • Programming and Commissioning of 75DR01D(Dryer D) at PPU in Kaduna Refining and Petrochemical Company,2008
  • Maintenance and calibration of Boiler controllers during the 7th TAM at Kaduna Refining and Petrochemical Company Ltd.      2008-2009
  • Electrical and Instrumentation work on 4 Tanks at SPDC Ughelli Pumping Station. 2009
  • Installation of 4-20mA signal converter on the PLC on the Nitrogen Coldbox at Port Harcourt Refining and Petrochemical Ltd.      2009
  • Restoration of the Auto-cut function of the Compressor Auxiliary pumps on the Nitrogen Coldbox at Port Harcourt Refining and      Petrochemical Ltd. 2009
  • Relocation of Industrial Compressor Bently Nevada Monitor/Display unit from field to Computer room, at Kaduna Refining and      Petrochemical Company,2010.
  • Commissioning of Raw Water Filtration Unit Kurita Panel (Filters I to L) for Kaduna Refining and Petrochemical Company.      2010
  • Design, Engineering, Procurement and Installation of Supervisory Control and Data Acquisition (SCADA) System for Fuel Plant      at Kaduna Refining and Petrochemical Company Ltd. 2008-2010
  • Leasing/Hiring of 756CMF, 7 bar Atlascopco Compressor to Kaduna Refining and Petrochemical Company, 2010- 2011
  • Programming and Commissioning of Raw water system panel (Filter A to H) and synchronization of Filters A to H, and Filters I      to L control panels at Kaduna Refining and Petrochemical Company. 2011
  • Training of KRPC Technical Staff on the Siemens S7-200/300 PLC. 2011
  • Procurement, Programming, Installation, and Calibration of ABB MOD 30ML Controllers for PPU Boiler3 at Kaduna Refining      and Petrochemical Company, 2012

Cement Manufacturing

  • Design and Installation of a full HMI/SCADA System for WAPCO PLC (Shagamu Works) 1996/97
  • Ladder Logic Design and Implementation for Siemens and PLC for WAPCO PLC (Ewekoro Works) 1997
  • Technical Back-Up/Maintenance Service on Instruments/Control Systems in WAPCO PLC 1996/1998
  • Programmable Logic Controller Training Workshop for 20 WAPCO PLC Engineers 1997/98
  • Year 2000 Investigation Test on Process Control Equipment for WAPCO PLC (Ewekoro and Shagamu Plants) 1998/99
  • Commissioning Assistance to WAPCO PLC Management in the Commissioning of the Ewekoro New Production Plant 2002
  • Commissioning Program for the Conversion of the control for WAPCO PLC No. 6 Cement Mill From Siemens PLC to Allen      Bradley PLC 2004

Other Projects

  • Supervision of Bore-hole Projects for Senator Peter Adeyemo Constituency projects at various locations in Ibadan including      Ido, Ijokodo and Kudeti
  • Supervision of UNAAB Geophysical studies on bore holes.